[1]杜连超.地铁车辆司机控制器性能检测装置[J].机车电传动,2012,(02):43-45.[doi:10.13890/j.issn.1000-128x.2012.02.015]
点击复制

地铁车辆司机控制器性能检测装置()
分享到:

机车电传动[ISSN:1000-128X/CN:43-1125/U]

卷:
期数:
2012年02期
页码:
43-45
栏目:
城市轨道车辆
出版日期:
2012-03-10

文章信息/Info

Title:
Design on Master Controller Performance Detecting Device for Metro Vehicle
文章编号:
1000-128X(2012)02-0043-03
作者:
杜连超
天津市地下铁道运营有限公司
关键词:
地铁车辆司机控制器性能参数检测装置
Keywords:
metro vehicle master controller performance parameter setection device
分类号:
U269.32+2,U231
DOI:
10.13890/j.issn.1000-128x.2012.02.015
文献标志码:
A
摘要:
分析了地铁车辆司机控制器的工作原理,指出了司机控制器性能检测的必要性。根据司机控制器操作的逻辑关系,设计出检测装置硬件部分和测试软件,并详细地阐述了检测方法,从而对司机控制器性能做出评价。
Abstract:
The working principle of master controller was analyzed, and necessity of master controller performance testing was pointed out. According to the logical relationship between the operations of master controller, the detecting device’s hardware and software were designed, and test methods were described in detail for making comments on master controller performance.

相似文献/References:

[1]杨晓林,王烟平.地铁车辆辅助逆变器过流保护的原因分析及改进[J].机车电传动,2015,(03):82.[doi:10.13890/j.issn.1000-128x.2015.03.023]
[2]严志勇,曾明高,罗国永,等.地铁车辆辅助逆变器的并网控制[J].机车电传动,2015,(04):59.[doi:10.13890/j.issn.1000-128x.2015.04.016]
 YAN Zhiyong,ZENG Minggao,LUO Guoyong,et al.Parallel Control of Auxiliary Inverters for Metro Vehicle[J].Electric Drive for Locomotives,2015,(02):59.[doi:10.13890/j.issn.1000-128x.2015.04.016]
[3]张兴宝,唐家龙,李 涛.西安地铁2 号线车辆司控器级位错乱故障的原因分析及整改方案[J].机车电传动,2015,(05):84.[doi:10.13890/j.issn.1000-128x.2015.05.023]
[4]陈 燕.受电弓状态动态检测系统在成都地铁2 号线的应用[J].机车电传动,2015,(05):91.[doi:10.13890/j.issn.1000-128x.2015.05.025]
 CHEN Yan.Application of the Pantograph Dynamic Detection System in Chengdu Metro Line 2[J].Electric Drive for Locomotives,2015,(02):91.[doi:10.13890/j.issn.1000-128x.2015.05.025]
[5]刘高坤,张江,王树森,等.直线电机地铁车辆动力学性能仿真研究的新方法[J].机车电传动,2015,(02):103.[doi:10.13890/j.issn.1000-128x.2015.02.025]
 LIU Gaokun,ZHANG Jiang,WANG Shusen,et al.New Method of Dynamics Performance Simulation for Metro Vehicle with Linear Motor[J].Electric Drive for Locomotives,2015,(02):103.[doi:10.13890/j.issn.1000-128x.2015.02.025]
[6]王寿峰,由建宏.地铁车辆空气弹簧压力急升引起总风欠压开关动作的对策[J].机车电传动,2014,(06):78.[doi:10.13890/j.issn.1000-128x.2014.06.021]
 WANG Shoufeng,YOU Jianhong.Measures of Air Spring Pressure Rapid Rising Resulting in Main Air Switch Triggered for Metro Vehicle[J].Electric Drive for Locomotives,2014,(02):78.[doi:10.13890/j.issn.1000-128x.2014.06.021]
[7]江 伟,张薇琳,王伟陈.地铁车辆辅助逆变器并联供电模式分析[J].机车电传动,2015,(06):63.[doi:10.13890/j.issn.1000-128x.2015.06.017]
 JIANG Wei,ZhANG Weilin,WANG Weichen.Analysis of Parallel Operation Power Supply for Metro Vehicle Auxiliary Inverter[J].Electric Drive for Locomotives,2015,(02):63.[doi:10.13890/j.issn.1000-128x.2015.06.017]
[8]袁碧珍,赵怀林,王苏晓,等.基于LabVIEW 的列车司机控制器的寿命测试系统[J].机车电传动,2015,(06):98.[doi:10.13890/j.issn.1000-128x.2015.06.026]
 YUAN Bizhen,ZHAO Huailin,WANG Suxiao,et al.Life Test System of Train Driver Controller Based on LabVIEW Software[J].Electric Drive for Locomotives,2015,(02):98.[doi:10.13890/j.issn.1000-128x.2015.06.026]
[9]周晓明,肖华,陈超录.长沙地铁2号线车辆三大核心系统集成[J].机车电传动,2014,(04):1.[doi:10.13890/j.issn.1000-128x.2014.04.001]
 ZHOU Xiao-ming,XIAO Hua,CHEN Chao-lu.Three Core Systems Integration in Changsha Metro Line 2[J].Electric Drive for Locomotives,2014,(02):1.[doi:10.13890/j.issn.1000-128x.2014.04.001]
[10]马喜成,李梁,刘家栋,等.地铁车辆客室门门间距取值分析与建议[J].机车电传动,2014,(04):65.[doi:10.13890/j.issn.1000-128x.2014.04.017]
 MA Xi-cheng,LI Liang,LIU Jia-dong,et al.Analysis and Suggestion on Distances between the Centers of Adjacent Passenger Doors for Metro Vehicle[J].Electric Drive for Locomotives,2014,(02):65.[doi:10.13890/j.issn.1000-128x.2014.04.017]

更新日期/Last Update: 2012-03-10